Four critical sewer lift stations will get permanent natural-gas backup generators so power outages don't leave the city running mobile generators back and forth — and risking sewage backups into neighborhoods. The cost came in at $740,807, roughly double the original estimate after design work finished.
At a glance
- Total mentions
- 1
- Last 30 days
- 0
Last discussed Jan 12, 2026.
Impact analysis
About $740,807 total, including a $216,895 amendment to the Sewer Capital Fund.
Residents citywide get protection against sewage backups and flooding during major storms.